Automatización de los caudales del Canal de Urgell por Coutex Sorigué

Automation of the flow rates of the Urgell Canal

Lleida

The gate designed by Coutex Sorigué for this project is equipped with wheels to facilitate the movement of the gates.

These canal gates, intended for large infrastructures, are engineered to ensure a watertight seal on three sides.

This project includes the following works:

  • Design, manufacture and installation of equipment
  • Upgrade of civil works
  • Installation of the oil-hydraulic circuit
  • Commissioning

Project

Client

Comunitat de Regants del Canal d'Urgell

Period

May 2013
 

Works

Design, manufacture and assembly of fixed-wheel canal gates in Canals d'Urgell, Lleida.
 

Coutex Sorigué automatiza los caudales del Canal de Urgell
Las compuertas canal tipo vagón en Canals d'Urgell han sido fabricadas por Coutex Sorigué 
El tablero diseñado por Coutex Sorigué para este proyecto incorpora ruedas que facilitan el desplazamiento de las compuertas.
Coutex Sorigué diseña, fabrica y monta compuertas canal tipo vagón
Para la automatización de los caudales del Canal de Urgell, Comunitat de Regants del Canal d'Urgell ha confiado en Coutex Sorigué

Technical data

Material

AISI-316L stainless steel for gate, frame and stem.

Drive

Using cylinders and an oil-hydraulic unit.

¿Necesitas asesoramiento?

Do you need advice?

Contact us