Trabajos de Coutex Sorigué en las compuertas para el pretratamiento de la depuradora de Tarragona

Renovation of penstocks at the Tarragona WWTP

Tarragona

Replacement of asynchronous electric motors with multi-turn actuators in drive systems of seven penstocks. The new motors are optimally suited for the dimensions and water load of the penstocks.

The first phase of the project involves modifying the non-rising design of three penstocks to a rising design. Additionally, the actuator is equipped with an integrated control unit and telematic control via Modbus TCP/IP.

The project also includes the complete overhaul of three other penstocks. The new penstocks, manufactured by Coutex Sorigué, feature a bi-directional sealing design.

This design prevents water from passing in either direction once the penstock is closed, which is particularly useful when the canal needs to be emptied on one side for maintenance work.

Additionally, the existing electrical installation was extended and adapted to provide real-time information on the status and position of the penstocks, allowing for remote operation.

Project

Client

Empresa Municipal Mixta d'Aigües de Tarragona (EMATSA)

Period

6 months

Works

Replacement of actuators on existing penstocks, design, manufacture and installation of three new penstocks and extension of the electrical installation.

Coutex Sorigué se ha encargado de la reposición de actuadores y modernización de compuertas en la EDAR Tarragona
Compuertas fabricadas por Coutex Sorigué con diseño de estanqueidad bidireccional.
Coutex Sorigué incorpora actuadores multi-vueltas a las compuertas de la EDAR Tarragona
Optimización de los sistemas de compuertas en la depuradora de Tarragona

Technical data

By-pass installation

70 m 

New penstocks

3 units

Night works

3 days 

New AUMA actuators 

7 units

New raising spindles

3 units 

New AUMA actuators

76 m

Laying of new wiring

600 m 

PVC cable rack

97 m