Coutex Sorigué is responsible for replacing all the Archimedes screws at the Gavà-Viladecans sewage treatment plant and the Zona Franca pumping station.
In the first phase, the existing screws are dismantled and scrapped. In the second phase, new Archimedes screws are supplied along with MTV-type couplings for vertical mounting. The service also includes the lower support for the screws, upper bearings, seals and gaskets.
To ensure a proper fit with the bed and achieve maximum efficiency, Coutex Sorigué handles all the civil works associated with the installation. The assembly process includes electrical and mechanical work, as well as the use of cranes.
Project
Client
EMSSA, Empresa Metropolitana de Sanejament, S.A. (Barcelona).
Period
November 2010 - February 2011
Works
Disassembly of the installed screws. Design, manufacture and assembly of six Archimedes screws and execution of all the civil works for the bed.
Technical data
Gavà-Viladecans WWTP Archimedes screws
- 4 units
- Flow rate: 900 l/s.
- Outer diameter: 1,700 mm.
- Pitch: 1,700 mm.
- Nº of entries: 3.
- Speed: 37.1 rpm.
- Engine power: 92 kW.
Zona Franca pumping station Archimedes screws
- 2 units
- Flow rate: 2.000 l/s.
- Outer diameter: 2,600 mm.
- Pitch: 2,210 mm.
- Nº of entries: 3
- Speed: 29.5 rpm.
- Engine power: 162 kW.