Design and manufacture of two degritting bridges for the wastewater treatment plant, Tarragona WWTP.
Due to years of operational wear and tear, the degritters have become obsolete and are in poor condition, necessitating their replacement with new equipment that retains the same operating principles.
Before proceeding, Coutex Sorigué must first clean the degritters of accumulated solids.
The project also includes the renovation of the walkways, trolleys, core-wall separators and hoppers for collecting floating materials.
All new components are made of AISI 316L stainless steel, which offers greater resistance to the chemically aggressive environment typical of this type of installation.
Project
Client
Empresa Municipal Mixta d’Aigües de Tarragona
Period
4 months
Works
Replacement of the two degritting bridges at the Tarragona WWTP with new Coutex Sorigué bridges.
Technical data
Degritting bridge footbridge
4.10 x 0.95 x 1.50 m (length x width x height).
Bridge bearings
8 units
Scum scraper
1,20 m
Railway profile rails
110 m
Material used for the new equipment
AISI 316L stainless steel
Pumping capacity
130 m3/h máx.
Transport motor power
0,25 kW
New scum screen
52 m