Coutex Sorigué cambia dos puentes desarenadores en la depuradora de Tarragona

Replacement of the degritting bridges at the Tarragona WWTP

Tarragona

Design and manufacture of two degritting bridges for the wastewater treatment plant, Tarragona WWTP.

Due to years of operational wear and tear, the degritters have become obsolete and are in poor condition, necessitating their replacement with new equipment that retains the same operating principles. 

Before proceeding, Coutex Sorigué must first clean the degritters of accumulated solids.

The project also includes the renovation of the walkways, trolleys, core-wall separators and hoppers for collecting floating materials.

All new components are made of AISI 316L stainless steel, which offers greater resistance to the chemically aggressive environment typical of this type of installation.

Project

Client

Empresa Municipal Mixta d’Aigües de Tarragona

Period

4 months

Works

Replacement of the two degritting bridges at the Tarragona WWTP with new Coutex Sorigué bridges.

Los nuevos puentes desarenadores de la EDAR Tarragona están fabricados en acero inoxidable AISI 316L
Se cambian los puentes desarenadores por equipos más resistentes y adecuados a la salinidad de Tarragona
Puentes de Coutex Sorigué, fabricados a medida manteniendo el principio de funcionamiento de los anteriores.
La EDAR Tarragona cuenta con dos nuevos puentes desarenadores diseñados ad-hoc por Coutex Sorigué

Technical data

Degritting bridge footbridge

4.10 x 0.95 x 1.50 m (length x width x height).

Bridge bearings

8 units

Scum scraper

 1,20 m 

Railway profile rails

110 m

Material used for the new equipment

AISI 316L stainless steel

Pumping capacity

130 m3/h máx.

Transport motor power

0,25 kW 

New scum screen

52 m